When to call
- Utilities need daylighted before you dig
- Excavating around live gas, fiber, or electric
- Frozen or congested ground where mechanical digging is slow or dangerous
- Pole and pier holes, slot trenches, remote digs
What we do
Our Kenworth T800 hydro-vac pairs high-pressure water with vacuum recovery: precise holes, no strike risk, spoils hauled off in the same unit. Utility contractors and plant engineers use it where the drawings are old and the consequences of a strike are not. It works alongside the rest of the vac fleet, so a daylighting job that turns into a bigger dig or a cleanup doesn't need a second contractor.
Clients
Dominion Energy · Appalachian Power · general contractors
Related
Bulk water hauling
5,000-gallon potable tankers for construction, emergency, and events.
See the service