Call this line when
- You need an asbestos survey ahead of renovation or demolition
- A survey found ACM that needs removed
- Pipe insulation, transite, or flooring needs removed under containment
- Your demo contractor and abatement contractor keep pointing at each other
- Emergency response disturbed suspect material
What we do
Cities have used WEL abatement crews as part of a larger building demolition scope. Because we also run the demolition and the disposal, abatement doesn't add a contractor to your job; it removes two. Inspection ahead of the work, then containment, removal, air clearance coordination, and manifested disposal.
Same dispatchers also handle.
- Demolition
Structural, industrial, municipal. Our own hauling.
- Waste disposal
Manifested transport to permitted facilities.
- Site remediation
Contaminated soil dug, hauled, and restored.